Engineering Optimization of an 80 t·d−1 Municipal Solid Waste Gasification-Incineration Furnace: A Case Study in Inner Mongolia
Municipal solid waste (MSW) management in Inner Mongolia has long relied on landfilling, facing land scarcity and leachate management challenges. This study addresses the region's dry, cold climate, high proportion of agricultural and livestock waste, fluctuating moisture content, and weak leachate treatment capacity. An engineering optimization was implemented on an 80 t·d−1 vertical rotary gasification-incineration system featuring a dual-combustion-chamber design (primary chamber for medium-temperature pyrolysis-gasification at 550–650 °C and secondary chamber for high-temperature oxidation above 900 °C), coupled with in-situ leachate recirculation. Field measurements showed improved processing capacity and continuous operation stability. Under the project's leachate yield, in-situ recirculation achieved on-site disposal without significant adverse effects on gasification-incineration conditions, providing buffering against moisture fluctuations. During the monitoring period, major gaseous pollutant emissions remained below current national standards. The results provide engineering references for the co-processing and stable operation of small-scale county-level MSW treatment facilities.